The usual scope. Every job is priced from its drawings, so tell us what yours calls for.

  • Taping and finishing to Levels 1 through 5
  • Level 5 skim coat for critical lighting and gloss paint
  • Corner bead, reveals and trims finished
  • Sanding with dust control
  • Prime-ready walls and ceilings

How we deliver it

01Condition the space

In winter, temporary heat and moisture readings decide when taping can start, so joints dry properly and don’t crack.

02Coat and sand

Joints are taped, coated and sanded to the specified level.

03Check in raking light

Walls are checked under a work light held at a low angle, which shows flaws that paint would reveal.

Common questions

What is a Level 5 finish?

The highest drywall finish. After the joints are taped and coated (Level 4), a thin skim coat goes over the entire surface. It is recommended where strong side light, such as from large windows, or gloss paint would show joints and texture differences.

Can you tape in winter?

Yes, with the right conditions. Joint compound needs warmth and controlled humidity to cure. Temporary heat and moisture readings govern when taping starts on each floor.